OKY PRO CLAY COURT (BAKIM İSTEMEYEN TOPRAK KORT)

CLASSIFIED COURT PACE ( ITF-1 )VSM YAPI OP2

The playing surface is covered with a special mixture of tile powder and binder, and the playground is applied with special paint lines.

The main floor leveling, the construction of the infrastructure, the application of tile dust, and the painting of the lines are performed.

APPLICATION AREA

Outdoor and Indoor Area, Natural Ground Tennis Court Covering.

INFRASTRUCTURE

PERMEABLE CONCRETE IS REQUIRED

SYSTEM DESCRIPTION

1) (Field) Field dimensions: It will be sized to be 18x36 meters from the inside. The existing ground will be leveled and corrected, and it will be manufactured in such a way as to give a slope of 0.3 to 0.5 to the sides.

2) The floor will be cleaned thoroughly and then Re-surfacer will be applied to the surface.

3) Special OKY Pro Clay Court will be applied to raise 2.2 cm above the floor.

4) The playing field lines will be painted.

5) As the last layer, fine tile powder will be laid on the soil surface and made ready for the game.

6) Irrigation system will be installed.