Clay Ground Tennis Court

TOPRAK KORT

The Earthen Ground Tennis Court is built on a total of 648 square meters open or closed, measuring 18 meters in width and 36 meters in length, according to the standards set by the International Tennis Federation (ITF). Clay tennis courts can be built in any size needed for amateur uses, apart from international dimensions.

VSM Sports, which specializes in the production and applications of tennis court flooring materials and other equipment, realizes the construction of tennis courts with clay floors on a turnkey basis in a short period such as 3-4 weeks.

⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀

Advantages
TOPRAK KORT

1- Advantages in terms of playing: The most important feature of the clay court compared to other floors is that the game is slower and more controlled. It is preferred by many tennis players. It is the most comfortable court type, especially for beginners and all players. The bounce and speed of the ball are slower than THE other floors.

2- Advantages in terms of health: Tennis is a sport that requires speed, quickness, flexibility, and endurance. Therefore, it is a sport in which all muscles and joints work. Many injuries occur due to the nature of such a sport. One of the biggest advantages of the clay court is that it is a type of floor where injuries are minimized. In general, most injuries are caused by sudden stops. The clay court leaves you a certain slip in the sudden stop and prevents injuries.

⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀

(VSM I)vsm yapı3

CLAY COURT CLASSIFIED COURT PACE (ITF-1)

The playing surface is covered with tile dust and the playground is applied with specially produced PVC lines.

The main ground leveling, the construction of the perimeter beams, the construction of the infrastructure, the automatic irrigation system, the application of tile dust, and the assembly of the lines are carried out.

⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀

vsm yapı 2(VSM II)

CLAY COURT CLASSIFIED COURT PACE (ITF-2)

1 1
2 2
3 3
4 4

Stage 1: Infrastructure Works
Excavation: The ground where the tennis court will be built is made flat by making the excavation.
The area where the tennis court will be built is examined, the necessary ground leveling is done, and the necessary fillings and compaction applications are completed.
Beams are installed for the wire fence and anchors of the poles are placed during concrete pouring.

Stage 2: Perimeter Poles and Wire Fence Works
Vertical pole pipes will be welded to the anchor pipes placed in the perimeter beam. Upper, middle, and horizontal pipes will be welded to vertical pipes.
Diagonal reinforcement will be made to the horizontal pipes at all four corners. Vertical reinforcement pipes will be installed at appropriate intervals to the vertical pipes on the four sides of the field.
“X” shaped cross pipes will be welded to the long sides and backs of the goal to strengthen the field construction.
For Lighting Poles, vertical pipes to the long sides of the court will be manufactured with stairs.
There will be 1 hinged door on the court.
One Tennis Court Pole and Tennis Net will be installed.
After all Iron production is done, it will be painted in the desired color with 2 layers of oil paint, and 1 layer of primer.
The perimeter of the court will be covered with 4×4 cm mesh, dipped galvanized, and PVC-coated wire mesh.
After the connection is made by stretching the wire mesh, the steel rope will be stretched, the tensioned steel ropes will be connected with terminals.
400 W Metal Halide projectors will be mounted on the produced projector poles.
Electrical Installation will be laid up to the panel and the projectors will be delivered in working condition.

Stage 3: Soil Ground Application
Drainage channels are excavated, drain flex pipes are laid on the lines and leveled with thick gravel.
Between the gravel and the tile dust; pumice stone (materials that vary according to the region) is laid and leveled.
Full Automation Irrigation System is installed
Tile dust is laid / Leveling is done
Tile semolina mixture produced in special vsm infrastructure is laid / Leveling is done
Line strips for the field lines are mounted on the floor according to the tennis court dimensions.
The cylinder and the slider are pulled.
Necessary applications are made until the field ground becomes playable.
The necessary training on field maintenance is given to the persons in charge of tennis court maintenance, and thereby the fields are delivered.